To see a detailed profile for a Project, please click on its title.
Title |
Client | Project Value | ||
|---|---|---|---|---|
| York Region Cafeteria Millwork | Region of York | $ 35,000 | ||
|
Cafeteria Millwork ...
Group(s): Food Services
|
||||
| NYGH Offices | North York General Hospital | $220,000 | ||
|
Office Renovations
...
Download: NYGH Offices
|
||||
| New Cafeteria & Remote Servery | Scarborough Grace Hospital | $380,000 | ||
|
Construction of new cafeteria and remote servery. ...
Group(s): Food Services
|
||||
| Radiation Treatment Room | Sunnybrook & Women's College Health Sciences Centre | $230,000 | ||
| Primus 5 Radiation Treatment Room TG41. ... | ||||
| Hospital Special Units Renov | St. Michael's Hospital | $1,500,000 | ||
| 2nd Floor - Haematology/Oncology/Positive Care Unit alterations and renovations. Area being an existing inpatient unit w ... | ||||
| Office Renovation | Genesis Microchip Inc. | $145,000 | ||
|
Phased reconfiguration of occupied space on 3 floors. ...
Group(s): Offices
|
||||
| Out Patient Fracture Clinic | St. Michael's Hospital | $870,000 | ||
| Construction of new out patient Fracture Clinic. Removal of part of exterior wall for new ground level entrance, i ... | ||||
| Patient Room & Washroom Renov | William Osler Healthcare/ Etobicoke General Hospital | $11,600 | ||
| Renovation of patient room and washroom. ... | ||||
| New Addition | Roman Catholic Episcopal Corp. | $230,000 | ||
|
Addition to existing St. Adians Church. ...
Group(s): General Construction
|
||||
| Gift Shop | Scarborough Grace Hospital | $80,000 | ||
| Construction of a new Gift Shop on the main level of the hospital. ... | ||||
| Drain Replacement | Nestle Canada Ltd. | $453,000 | ||
|
Replacement of existing 6" diameter main sewer with new 8" diameter sewer from street line to rear of plant utilizing op ...
Group(s): General Construction
|
||||
| Office Space Construction | Manpower Inc. | $48,000 | ||
|
Construct 3,200 square feet of office space. ...
Group(s): Offices
|
||||
| Steel Roof | Toyota Canada Inc. | $1,772,000 | ||
|
Reinforce existing steel roof structure in occupied office building in three phases. ...
Group(s): General Construction
|
||||
| Kitchen Upgrade | St. Jude Community Home | $36,000 | ||
|
Upgrade of kitchen equipment and services. ...
Group(s): Food Services
|
||||
| Cafeteria Renovations | Imperial Oil | $137,600 | ||
|
Cafeteria renovations. ...
Group(s): Food Services
|
||||
| Mechanical Bases | Geo. A. Kelson Company Limited | $22,000 | ||
|
Civil work for air handling unit at the George Gardiner Museum of Ceramic Art. ...
Group(s): General Construction
|
||||
| New Reception Area | Genesis Microchip | $65,000 | ||
|
Construction of a New Reception Area. ...
Group(s): Offices
|
||||
| Front Lobby | Imperial Oil | $91,000 | ||
|
Security Desk, Reception Desk and Display Millwork for Front Lobby. ...
Group(s): Offices
|
||||
| Esso Cafeteria | Imperial Oil Limited | $450,000 | ||
|
Renovate Cafeteria Eating Area - 111 St. Clair Ave. W. ...
Group(s): General Construction
Download: P2 Esso cafeteria
|
||||
| Hospital Cart Wash | Scarborough Hospital Grace Division | $111,000 | ||
| Replace existing cart sterilizer. Remove existing equipment and walls, form and pour new pit and drainage, install new c ... | ||||
| New & Renovate Laboratories | Centre for Addiction and Mental Health | $800,000 | ||
| Construct new laboratories and renovate existing laboratories. ... | ||||
| Classroom | Toyota Canada Inc. | $361,000 | ||
|
Construct classroom for corporate training including finishes and equipment. ...
Group(s): General Construction
|
||||
| Cart Wash | Scarborough Hospital Grace Division | $111,000 | ||
|
Replace existing cart sterilizer. Remove existing equipment and walls, form and pour new pit and drainage, install new c ...
Download: P1 Cart wash
|
||||